Skip to main content
Retina Institute of Illinois, Huntley

Commercial Construction Projects

Logo

Commercial Build Out of Retina Institute of Illinois in Huntley


Build Tech Commercial Development built a 1,932 sq. ft . eye doctor's office that prioritizes patient comfort, efficient operations, and a professional and inviting atmosphere. The facility has a waiting area, multiple exam rooms, tech rooms and procedures rooms.


Retina Institute of Illinois in Huntley – Commercial Project »

September 12, 2019



Retina Institute Of Illinois Entrance link

Reception Desk link

Reception Desk Behind link

Reception Desk Front link

Reception Waiting Room link

Server Room link

Office Hallway link

Exam Room Desk link

Exam Room Sink link

Exam Room Ceiling link

Eye Exam Room 1 link

Eye Exam Room 1a link

Eye Exam Room 2 link

Eye Exam Room 2a link

Eye Exam Room 3 link

Eye Exam Room 3a link

Eye Exam Room Screen link

Hallway Station link

Procedure Room 1 link

Procedure Room 2 link

Doctors Office link

Break Room link


The vinyl tile is being installed at Retina Institute of Illinois in Huntley »

August 31, 2019



The floors are being prepared for vinyl tile at our eye doctor’s office build out in Huntley »

August 30, 2019



The cabinets have been installed at Retina Institute of Illinois in Huntley »

August 29, 2019



We are grinding the floor prior to installing the vinyl tile at Retina Institute of Illinois »

August 24, 2019



The cabinets and counter tops have been delivered in Huntley »

August 23, 2019



The doors and casings are being installed in Huntley »

August 23, 2019



The sprinkler work is done at our commercial build out of an eye doctor’s office »

August 21, 2019



The walls are being painted at Retina Institute of Illinois in Huntley »

August 21, 2019



The rough electric and HVAC are done and we are ready for above ceiling inspection in Huntley »

August 20, 2019



Drop ceiling grid is done at our commercial build out of the eye doctor’s office in Huntley »

August 18, 2019



The walls are primed and we are ready to start the drop ceilings at Retina Institute of Illinois »

August 13, 2019



We are grinding the floors and leveling them at our Commercial Eye Doctor Build out in Huntley »

August 12, 2019

This is to get ready for the tile installation.



The walls have been sanded and are ready for priming at Retina Institute of Illinois in Huntley »

August 9, 2019



We are taping and mudding the drywall at Retina Institute of Illinois in Huntley »

August 6, 2019



Drywall has started at our commercial Eye Doctor’s office in Huntley »

August 1, 2019



The rough plumbing, electrical and HVAC are completed at our Retina Institute of Illinois build out »

July 30, 2019

 



The framing is done and the rough plumbing has started at Retina Institute of Illinois in Huntley »

July 25, 2019



We have started framing the rooms at our commercial Eye Doctor build out in Huntley »

July 23, 2019



The concrete has been poured over the underground plumbing at Retina Institute of Illinois »

July 20, 2019



The underground plumbing is done for the new hand sinks at the doctors office in Huntley »

July 19, 2019



The concrete has been cut so the underground plumbing work can start on our build out in Huntley »

July 18, 2019



The walls have been removed and the floor tiles are being removed at Retina Institute of Illinois in Huntley »

July 15, 2019



The drop ceiling has been removed and the walls are starting to come down at our Retina Institute Build Out in Huntley »

July 12, 2019



Interior demolition has begun in Huntley »

July 12, 2019

The existing drop ceiling is being removed.



We are starting a new commercial build out of Retina Institute of Illinois in Huntley »

July 10, 2019





«back