Construction


Demo has begun in creating a new look for Teddy Rose and ACH! »

December 8, 2017

We have had the ceiling tiles and drywall removed along to get prepared for adding additional support to the front on the building to support a new facade and parapet wall.

 





We have installed the new flat roof on Shalimar Plaza in Addison. »

November 24, 2017

The existing roof was torn off and a new TPO flat roof was installed on the new strip mall.

 

 





The parking lot is done at our commercial job in Skokie »

November 15, 2017

The parking lot has been paved and the parking lot strips have been painted.  Now we w need to wait at least 7 days before driving on the new asphalt.





We are paving the parking lot at C.A.R.E. in Skokie »

November 15, 2017






Temporary Shoring is needed before we can go forward with excavation at Shalimar Plaza »

October 25, 2017

We have added temporary shoring at each end of the warehouse and are adding additional lateral support to the outside walls before we can excavate.





The concrete work has been completed at Community Animal Rescue Efforts, Inc. in Skokie! »

October 6, 2017





The curbs have been framed at our commercial job in Skokie »

October 5, 2017





We are removing the existing parking lot at C.A.R.E in Skokie! »

October 4, 2017





The water service is done and setup inside the C.A.R.E. building. »

October 3, 2017

The new water service is inside the building and we are back-filling where we ran the new water lines from the street to the building with stone.





Bringing the new water line from the main in the street to the building at 4927 Main St. Skokie »

October 2, 2017

The concrete vault has been installed to protect the valve at the water main in the street, we have brought the water line to the building and are digging inside the building to install the new water line.

 





Water and Storm work continues at our commercial project in Skokie »

September 30, 2017

We have tapped into the main water line across the street and are bringing the new water line to the building.





We have started framing the walls at C.A.R.E. »

September 29, 2017

Demolition has been completed and we have started to frame new walls.

 





Civil work has begun at Community Animal Rescue Efforts, Inc. in Skokie »

September 27, 2017

We have started the storm work to replace two existing sinking storm basins in the parking lot.

 





We have tuck pointed our Commercial project in Skokie »

September 25, 2017

Tuck pointing and power washing of the original building makes the building look brand new again.

 





We have started interior demolition for C.A.R.E. Animal Rescue in Skokie. »

September 21, 2017

We have started to demolish the walls to create the wellness area, real life room and the cat feeding and laudry area.





Demolition of the warehouse is done in Addison »

August 26, 2017





Starting Demolition on the warehouse on the commercial building in Addison »

August 18, 2017

The roof has been cut so that the demolition can begin to remove 1/2 of the existing warehouse to create 8 store fronts.

 





Adding Additional Steel Support to brace the roof in Addison »

August 17, 2017

We are adding additional steel supports to brace the wall and roof since we had to remove a column that was hidden in a wall that was demolished.





We will be starting a commercial build out of an animal rescue facility in Skokie soon! »

July 25, 2017

We will be building out an animal rescue and adoption facility for Community Animal Rescue Effort (C.A.R.E.) at their soon to be new location at 4927 Main St. in Skokie.





Interior demolition has started at the 8 storefront build outs in Addison! »

July 24, 2017

We have started to remove all the existing ceiling tiles, electrical conduits and HVAC duct work.





The Fire Sprinkler Service has been moved in Addison. »

July 18, 2017

We have moved the RPZ values and have made the new fire sprinkler water connections to the existing Shalimar banquet hall.





Move RPZ values from old sprinkler room to new sprinkler room at Shalimar Plaza »

July 14, 2017

We need to move the existing RPZ’s from the sprinkler room that will be demolished to the new sprinkler room location.





Moved Waterline for Existing Shalimar Banquet Hall »

June 19, 2017

We had to move the water line from the portion of the building that is being demolished to the new water/sprinkler room so that we can begin demolition.





Testing the Fire Sprinkler Water Service at Shalimar Plaza in Addison. »

June 16, 2017

Before we could turn on the new fire sprinkler service, we need to perform a water flush test and a chlorination test for the fire department.  The new fire sprinkler service is up and running.





Moving the fire sprinkler water service for the 8 store fronts in Addison. »

June 15, 2017

The existing fire sprinkler water service is in the portion of the building that we are demolishing.  We had to excavate and run a new water line to the new sprinkler room.





Announcing Shalimar Plaza – 8 Strip mall store fronts in Addison »

June 11, 2017

Construction to start soon!





Starting A New Commercial Project At Shalimar Banquets in Addison »

May 31, 2017

Shalimar Banquets AddisonShalimar Banquets Addison





We will be transforming the warehouse along North Ave into 8 store fronts in Addison. »

May 31, 2017

We will be cutting about 1/3 of the warehouse to make room for parking along North Ave.  We will have to move the Fire Protection water service from the section of the building that is going to be demolished.